国产裸体美女永久免费无遮挡,解开人妻的裙子猛烈进入,人世间电视剧免费观看全集完整版,波多野结衣在线视频

歡迎進入山東恒能環(huán)保能源設備有限公司

熱線電話

0531-69953988

分類導航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設備有限公司

聯(lián)系電話:18678860671

服務熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

冷卻塔安裝要求

1.冷卻塔安裝要求

1. Installation requirements of cooling tower
(1)冷卻塔的安裝應根據(jù)設備的各種條件,考慮其安裝位置的地面及其荷載能力,同時也考慮外界條件。
(1) The installation of the cooling tower shall consider the ground and its load capacity at the installation location as well as the external conditions according to various equipment conditions.
(2)安裝時應注意冷卻塔的基礎按規(guī)定的尺寸預埋好水平鋼板,各基礎點的標高應在同一標高的水平面上。
(2) During installation, it shall be noted that the horizontal steel plate shall be embedded in the foundation of the cooling tower according to the specified size, and the elevation of each foundation point shall be on the horizontal plane of the same elevation.
(3)塔體應放置水平。水塔在施工安裝時,為防止壓壞底盤,施工人員應踏在底盤的加強筋上,在安裝塔外殼、底盤等纖維件時,為防止外殼底盤等變形可先穿螺釘,而后依次逐漸緊固,在確認底盤不變形,附近干凈、干燥的條件下,為避免使用時漏水可在接觸處鋪設纖維氈及涂樹脂。
(3) The tower body shall be placed horizontally. During the construction and installation of the water tower, in order to prevent crushing the chassis, the construction personnel should step on the reinforcing ribs of the chassis. When installing the tower shell, chassis and other fiber parts, in order to prevent the deformation of the shell and chassis, the screws can be threaded first, and then the screws can be tightened gradually. After confirming that the chassis is not deformed, and the surrounding area is clean and dry, the fiber felt and resin can be laid at the contact point to avoid water leakage during use.
2.冷卻塔本體安裝
2. Installation of cooling tower body
冷卻塔不得安裝在通風不良和出現(xiàn)濕空氣回流的場合,須安裝在通風良好的場所。否則將會降低冷卻塔的冷卻能力。冷卻塔一般安裝在冷凍站的屋頂上,以形成高壓頭,用以克服冷凝器的阻力損失。水泵將需要處理的冷卻水從水池抽出送至冷卻塔,經(jīng)冷卻降溫后從塔底集水盤向下自流壓入冷凝器中,并繼而靠水頭壓差自流入水池,如此循環(huán)。
The cooling tower shall not be installed in the place with poor ventilation and wet air return, but in the place with good ventilation. Otherwise, the cooling capacity of the cooling tower will be reduced. The cooling tower is generally installed on the roof of the refrigeration station to form a high-pressure head to overcome the resistance loss of the condenser. The water pump pumps the cooling water to be treated from the pool to the cooling tower. After cooling, it flows down from the water collecting tray at the bottom of the tower to the condenser automatically, and then flows into the pool automatically by the head pressure difference, so as to circulate.
安裝時,應根據(jù)施工圖指明的坐標位置就位,并應找平找正,設備要穩(wěn)定牢固,冷卻塔的出水管口及噴嘴方向、位置應正確。
During installation, it shall be in place according to the coordinate position indicated in the construction drawing, and shall be leveled and aligned. The equipment shall be stable and firm, and the direction and position of the water outlet and nozzle of the cooling tower shall be correct.

相關產(chǎn)品 我們的存在,是為了更好的服務于沼氣等可燃氣體凈化及利用行業(yè)
精品国产乱码久久久久久浪潮| 亚洲爆乳成人无码aaa片漫画| 张柏芝阿娇全套无删减1313| 被主人野外调教暴露羞辱历程| 国产精品美女www爽爽爽视频| 日久精品不卡一区二区| 爽灬爽灬爽灬毛及a片| 两根硕大一起挤进小紧h共妻| av免费网站在线观看| 99国产精品99久久久久久| 日本真人做爰免费视频120秒| 无码gogo大胆啪啪艺术| 亚洲国产精品无码久久A片小说| 久久久无码精品亚洲日韩按摩| 蜜桃视频app下载直播| 一女三男做2爱a片免| 性少妇videoxxx欧美69| 嗯灬啊灬把腿张开灬动态图| 清冷医生受h打开腿乖听话男男| 最近免费韩国高清在线观看视频| 他用嘴巴含着我奶头吸怎么办| 大内密探零零性| 宿舍玩弄六个女同学高txt| 同桌上课脱裙子让我帮他自慰| 熟女大屁股白浆一区二区| chinese少妇偷sex国语| FREE性欧美HD另类精品| 成人在线电影| 麻豆蜜桃69无码专区在线| 久久兔费黄a级毛片高清| 欧美精品乱码99久久蜜桃| 免费视频在线观看| 性之剧毒在线观看| 疯狂揉肉蒂高潮h失禁视频| 国产99久一区二区三区a片| 久久成人国产精品麻豆| 被主人在厨房用黄瓜调教| 国产片+人+综合| 樱桃视频影院在线播放| 国产jjizz女人多水免费| 午夜18禁试看120秒男女啪啪|